Slack time tells a project team how much schedule cushion it actually has, but the number is easy to work out once you know which two dates matter. You do not need specialist project software: the earliest and latest possible start dates are enough to put a figure on the buffer, and the same subtraction works for an entire project or for a single stage of it.
Slack time, also called float time, is the maximum delay a project can absorb without failing. The slack time formula subtracts the earliest possible start time (EST) from the latest possible start time (LST): SL = LST - EST. In the source example, a project that can start as early as 10 February and no later than 23 February has 13 days of slack. It can be set for a whole project or for individual stages.
What is the slack time formula?
To calculate the slack time (SL), you subtract the earliest possible start time (EST) from the latest possible start time (LST). Written out, the slack time formula is:
Here is the latest date the project can begin without going past the deadline, and is the earliest date the company can start. The difference between them is the extra time available to absorb problems. The same relationship underlies the source example, the calculator's output, and the four-step manual method below.
| Case | Earliest start (EST) | Latest start (LST) | Slack time (ST) |
|---|---|---|---|
| Worked example project | 10 February | 23 February | 13 days |
| Two-week team, three-week schedule | 2 weeks | 3 weeks | 1 week |
Worked example: a February 10 to 23 project
Take a project whose scheduled start date — the earliest possible start date — is the 10th of February, while the latest possible start date is the 23rd of February. Substituting these into the formula gives:
So the slack time for this project is 13 days. In other words, the team can delay the start by up to thirteen days, or absorb that much slippage during delivery, before the project runs past the agreed completion date. That is the buffer the project manager has available to rectify any issues that develop.
How do I use the slack time calculator?
The calculator reduces the method to two date inputs and one result. It is very easy to use:
- Click the calendar icon and choose the earliest possible date (EST) the project can start.
- Choose the latest possible date (LST) the project can start.
- Read the slack time (ST) for the project in the result field.
The two inputs correspond to the earliest start time (EST) and latest start time (LST) fields, and the output is the slack time (ST) field. Change either date and the buffer recalculates immediately, which makes it simple to check how a different agreed deadline changes the room available for delays.
Frequently Asked Questions
What are the steps in calculating slack time for a project?
To calculate slack time for a project: determine the earliest date your company can start the project; determine the latest date the project can begin without going over the deadline; subtract the start date from the end date. The resulting answer is the slack time for the project.
Which two dates does the slack time calculator need?
It needs the earliest possible start date (EST) and the latest possible start date (LST). You pick both from the calendar icons, and the tool subtracts the earlier date from the later one.
What does the calculator show as its result?
It shows the slack time (ST) for the project — the number of days of buffer between the two start dates you entered. In the February 10 to 23 example, that result is 13 days.
Can slack time be set for only part of a project?
Yes. Slack time can be set for the entire project or for different stages or parts of the project, so a manager can track the buffer on one section without changing the calculation method.
References
- Omni Slack Time Calculator source content: definition, formula, worked example and calculator instructions.
- Project-management references on float time as the delay a task can absorb without missing a deadline.